Kiosk RFQ Template: How to Request and Compare Quotes from Kiosk Manufacturers

By MHY Engineering Team · Updated

Two buyers ask three factories for a quote on "a 21.5-inch self-order kiosk." One receives prices from $620 to $1,480 and cannot tell which is right; the other receives three quotes within 15% of each other with clear differences explained. The only difference is the request. A good request for quotation (RFQ) saves weeks, avoids surprises at the customs desk and makes the supplier's answer comparable. This guide gives you a template and a method.

1. Why most kiosk quotes are not comparable

A kiosk is a system, not a single product. Two quotes labeled "21.5-inch kiosk" can differ in screen brightness, touch technology, processor, memory, operating system license, cabinet thickness, finish, peripherals, cables and packaging. Without a specification, each supplier fills the gaps with its own assumptions, usually the cheapest ones to win the first round. Then, after the order, the missing items appear as extras.

2. The seven blocks of a good RFQ

  1. Project summary: what the kiosk does, where it is installed (indoor, window-side, outdoor), who uses it, hours of operation and a one-paragraph user flow.
  2. Quantities and phasing: pilot quantity, first batch, annual volume, and the date you need each. Pricing improves with volume; show the real range.
  3. Technical specification: screen, touch, computer, OS, peripherals, connectivity, power, certifications. A fill-in table is below.
  4. Customization: logo, color, material, finish, labeling, languages on stickers, packaging design, any bespoke sheet-metal changes. See our guide on enclosure design and customization for what drives tooling cost.
  5. Software and integration: who supplies the application, required SDK, API or protocol, remote management, what you need from the factory (drivers, firmware, test tools).
  6. Commercial terms: destination country, preferred Incoterm, payment terms, warranty length, spare-part ratio, after-sales response expectations.
  7. Evaluation: the date quotes are due, your decision date, whether you require samples, and the criteria you will use (price, lead time, quality evidence, support).

3. Copy-paste RFQ template

PROJECT
- Product type: self-order kiosk / check-in kiosk / payment kiosk / other
- Site: indoor / window-side / outdoor; ambient temperature range
- Operating hours: ___ h/day
- User flow (3-5 lines): ___

QUANTITY & TIMELINE
- Pilot: ___ units by ___ First batch: ___ units by ___ Annual: ___

SPECIFICATION
- Display: ___ inch, portrait/landscape, ___ nits, cover glass ___ mm, optical bonding Y/N
- Touch: PCAP / IR / other; glove or wet-finger use Y/N
- Computer: Android / Windows / Linux; CPU ___; RAM ___ GB; storage ___ GB; OS license included Y/N
- Peripherals: printer (58/80 mm, cutter, presenter), QR/barcode scanner, card reader (EMV/NFC), ID/passport reader, camera, speaker, cash module, other
- Connectivity: Ethernet / Wi-Fi / 4G; power ___ V; plug type ___
- Certifications required: CE / FCC / RoHS / UL / other; target markets ___
- Environment: IP rating ___ ; IK rating ___ ; anti-vandal needs ___

CUSTOMIZATION
- Logo/colors/finish: ___ (artwork attached)
- Mechanical changes: ___
- Packaging: export carton / wooden crate / branded box

SOFTWARE
- Application provided by: us / factory / third party
- SDK/API required: ___ Remote management: ___

COMMERCIAL
- Destination: ___ Incoterm: EXW / FOB / CIF / DDP
- Payment terms: ___ Warranty: ___ months Spares: ___ %

PLEASE QUOTE (itemized)
- Unit price per quantity tier (pilot / first batch / annual)
- NRE / tooling / setup costs (one-time)
- Lead time for samples and production
- MOQ and what changes below MOQ
- Packing: carton size, weight, units per pallet
- Quote validity period

Attach drawings, photos of the site, brand artwork and any sample receipts or screens. A single page of visuals often removes more ambiguity than three pages of text.

4. How to compare quotes line by line

Put every quote into the same spreadsheet and compare these rows, not just the total:

ItemWhat to check
DisplaySize, brightness (assembly), glass, bonding, panel brand and lifespan
ComputerCPU model, RAM and storage, OS version and license, industrial or consumer grade
CabinetMaterial and thickness, finish, ventilation, lock type, serviceability
PeripheralsBrand and model of printer, reader and scanner; cutter and presenter included?
Cables, adapters, powerPower cord for your country, adapters, accessories
SoftwareSDK, drivers, firmware, remote management, one-time vs recurring fees
CertificationReports and certificates for the actual model, not a sister model
PackagingExport carton, foam, crate, shock indicators
WarrantyLength, what is covered, who ships spare parts, response times
CommercialIncoterm, payment terms, validity, lead time, MOQ

Normalize prices to the same Incoterm and the same scope before ranking. A low ex-works (EXW) price can be higher than a free-on-board (FOB) or delivered price once you add domestic freight, export clearance and port charges.

5. Hidden costs to look for

  • NRE and tooling: new enclosure molds, dies, or fixtures are one-time but can be significant. Ask whether they are amortized in the unit price or separate.
  • Operating system and software licensing, including per-unit Windows licenses or paid MDM and remote management services.
  • Certification costs for new markets or configurations. See our compliance guide.
  • Spare parts and accessories that are not included in the unit price (keys, cables, paper rolls, adapters).
  • Freight, insurance, customs duties and taxes, which depend on the Incoterm.
  • Warranty exclusions such as vandalism, liquid ingress or software issues.
  • Support costs after the warranty, including parts price lists.

The full lifetime picture is in our total cost of ownership guide.

6. MOQ, lead time and what drives them

MOQ (minimum order quantity) depends on how much of the product is standard. A catalog model with standard parts can often be ordered in small batches; a new cabinet with custom sheet metal, a bespoke PCB or special panels will have higher MOQ because of setup costs and component minimums. Lead time stacks up as: sample build, your approval, component procurement, assembly, burn-in testing, packing, and shipping. Ask for each stage in days, and ask which stage depends on parts with long supply times (panels, specialist peripherals).

7. Samples and pilot batches

For standard products, a paid sample unit is a small price compared with a failed batch. Evaluate:

  • Visual and mechanical inspection: edges, paint, gaps, lock quality, cable routing
  • Readability in your light conditions (see our display selection guide)
  • Peripheral performance: print quality, scan rate, card read rate, jam behavior
  • Software integration with your application, including remote update and recovery after power loss
  • Burn-in: run it continuously for several days with a test script

After samples, a pilot batch of 5–20 units in real sites tells you far more than lab testing. Agree up front that a defect rate above a threshold triggers rework at the supplier's cost. Our China sourcing checklist covers supplier verification and quality control steps that complement the RFQ.

8. Questions to ask every supplier

  • Which parts do you make in-house and which are bought? Which brands?
  • Can I see test reports for this configuration?
  • What is the defect rate in the last year and how do you handle returns?
  • How long do you keep spare parts and panels available?
  • Do you provide an SDK, documentation and engineering support in my time zone?
  • Who owns the tooling and the design files after the order?

9. Red flags

  • A price far below the others with no explanation for the difference
  • A quote that does not list the model or brand of key components
  • Certificates for a "similar" product rather than yours
  • No clear answer on lead time or what is included in the warranty
  • Pressure to pay the full amount before any sample or inspection

Send your RFQ to MHY KIOSK

You can paste the template above into our contact form or email it to our sales engineers. We respond with an itemized quote, recommended configuration for your site and a sample plan. Learn about our factory capabilities on the OEM/ODM service page, and compare options in our self-service kiosk range.